Thesis Details
Statistické vyhodnocování výrobních rozvrhů
It is not easy to uphold a manufacturing enterprise in today’s market, that is full of competition and yet remain in profit. The main focus of these enterprises is production and that is closely linked to its planning and scheduling. A good production schedule can have a great impact on business. On one hand, it may cause some unnecessary costs, but on the other hand, it can save resources that might be used in another area. The aim of this bachelor thesis is to find the best production schedule. In this thesis I have offered some statistical indicators, using those I seek to objectively evaluate the quality of the production schedule. The outcome of this work is a set of statistical quality indicators of production schedules and program (implemented in the information system MES PHARIS), which receives input data of the production, calculates the values of the statistical indicators and then the calculated results are displayed graphically.
production, production planning, production scheduling, production schedule, planning methods, scheduling methods, statistical indicator, schedule quality
Bidlo Michal, doc. Ing., Ph.D. (DCSY FIT BUT), člen
Chudý Peter, doc. Ing., Ph.D. MBA (DCGM FIT BUT), člen
Křivka Zbyněk, Ing., Ph.D. (DIFS FIT BUT), člen
Novák Michal, doc. RNDr., Ph.D. (DMAT FEEC BUT), člen
@bachelorsthesis{FITBT20112, author = "Pavol Andra\v{s}ko", type = "Bachelor's thesis", title = "Statistick\'{e} vyhodnocov\'{a}n\'{i} v\'{y}robn\'{i}ch rozvrh\r{u}", school = "Brno University of Technology, Faculty of Information Technology", year = 2017, location = "Brno, CZ", language = "czech", url = "https://www.fit.vut.cz/study/thesis/20112/" }