Department of Intelligent Systems

Alba Metal Preparedness Analysis and Industry 4.0

Czech title:Analýza připravenosti firmy Alba Metal pro prediktivní údržbu a Průmysl 4.0
Research leader:Sadovský Petr
Team leaders:Veigend Petr
Team members:Rozman Jaroslav
Agency:Intemac Solutions, s.r.o.
Start:2018-05-02
End:2018-05-23
Keywords:industry 4.0
Annotation:
The company is engaged in the bending of wires with a diameter of 1 - 10 mm on CNC bending machines. This is a mass production. The machine park consists of 30 CNC bending machines, welding robots and the like.

They have difficulty producing production. They do not know whether the machine is standing or producing. They know it from a few pieces made after the shift.

Therefore, their intention is the following.

In the first step, keep an eye on whether the machines are driving or not. In the second step, compare real production with production plans and implement predictive maintenance in the third step.

The company uses ERP Helios Orange.

The output is a message that contains a description of possible solutions.

Your IPv4 address: 54.172.234.236
Switch to https